Close Menu
    What's Hot

    Duggar Family Back in Spotlight as Joseph and Kendra Face Child Endangerment Charges

    March 21, 2026

    Oahu Floods Trigger Mass Rescues as Heavy Rain Threatens More Damage

    March 21, 2026

    Cuba Gets a Lifeline!

    March 21, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Voxtrend NewsVoxtrend News
    Subscribe
    Voxtrend NewsVoxtrend News
    Home»Uncategorized»Chicago’s annual fall bridge lifts begin this week along the river
    Uncategorized

    Chicago’s annual fall bridge lifts begin this week along the river

    Voxtrend NewsBy Voxtrend NewsSeptember 30, 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    CHICAGO – Chicago will begin its annual fall bridge lifts this week to allow sailboats and other recreational ships to move from Lake Michigan to winter storage facilities.

    What we know:

    According to the Chicago Department of Transportation, the fall “boat runs” will start Wednesday.

    The bridges along the main and south branches of the Chicago River, from DuSable Lake Shore Drive to the 18th Street Bridge, will be lifted one after another.

    Lifts happen twice a week, every Wednesday at 9:30 a.m. and Saturday at 9 a.m., through Nov. 15. The process occurs in both the fall and spring, when boats are pulled and then returned to Lake Michigan.

    Springtime Chicago River bridge lifts | Getty Images

    Each bridge is typically raised one at a time, taking about 8 to 12 minutes. Traffic will be stopped during the lifts, and drivers may either wait or take alternate routes until the bridges are lowered.

    Fall 2025 bridge lift schedule

    • Wednesday, Oct. 1 at 9:30 a.m.
    • Saturday, Oct. 4 at 9 a.m.
    • Wednesday, Oct. 8 at 9:30 a.m.
    • Saturday, Oct. 11 at 9 a.m.
    • Wednesday, Oct. 15 at 9:30 a.m.
    • Saturday, Oct. 18 at 9 a.m.
    • Wednesday, Oct. 22 at 9:30 a.m.
    • Saturday, Oct. 25 at 9 a.m.
    • Wednesday, Oct. 29 at 9:30 a.m.
    • Saturday, Nov. 1 at 9 a.m.
    • Wednesday, Nov. 5 at 9:30 a.m.
    • Saturday, Nov. 8 at 9 a.m.
    • Wednesday, Nov. 12 at 9:30 a.m.
    • Saturday, Nov. 15 at 9 a.m.

    The Source: The information in this story came from the Chicago Department of Transportation.

    ChicagoTrafficChicago Department of TransportationNews

    The post Chicago’s annual fall bridge lifts begin this week along the river appeared first on Tripplenews.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Voxtrend News
    • Website

    Related Posts

    Duggar Family Back in Spotlight as Joseph and Kendra Face Child Endangerment Charges

    March 21, 2026

    Oahu Floods Trigger Mass Rescues as Heavy Rain Threatens More Damage

    March 21, 2026

    A Deadly Year in Nigeria: Rising Violence Leaves Civilians Bearing the Brunt

    March 20, 2026

    Chuck Norris, Quiet Giant of Action Cinema, Dies at 86

    March 20, 2026
    Add A Comment

    Comments are closed.

    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Editors Picks
    Latest Posts

    Subscribe to Updates

    Get the latest sports news from SportsSite about soccer, football and tennis.

    Advertisement
    Demo
    Voxtrend News
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.