Close Menu
    What's Hot

    Family of ICU Nurse Shot by Federal Officers in Minneapolis Denies DHS Claims, Calls for Truth

    January 25, 2026

    U.S. Braces for Historic Winter Storm, 4,000 Flights Canceled, Over 160,000 Without Power

    January 25, 2026

    Husband of Newport Beach socialite was found dead at bottom of 75 foot embankment arrested

    January 24, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Voxtrend NewsVoxtrend News
    Subscribe
    Voxtrend NewsVoxtrend News
    Home»News»Culvert repair, pedestrian walkway construction south of Denver will close Broadway starting Sunday night
    News

    Culvert repair, pedestrian walkway construction south of Denver will close Broadway starting Sunday night

    Voxtrend NewsBy Voxtrend NewsSeptember 21, 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    South Broadway will experience lane closures near Denver starting Sunday evening as the City of Littleton works to both replace a culvert and construct a pedestrian walkway. “Significant” traffic impacts are expected through spring 2026, and the broader project is expected to be complete by fall of 2026.

    City officials said they can accomplish two things at once, as replacing the culvert will require crews to dig a 30-foot trench into Broadway. That will allow them the opportunity to add a pedestrian underpass in the area of Broadway and Dry Creek Road.

    “It’s a big project. It is a project that normally is something that’s a 5- to 10-year scale, and the fact that we’re under construction in less than a year with the funding in place is (a) tremendous effort,” Littleton Water Resources Engineer Sarah White said.

    A series of sinkholes in the area in 2023 prompted the city to undertake a massive investigation into its infrastructure, White said. In at least one of those, a car fell into the sinkhole. That means city officials are now “triaging” which pipes need repair or replacement. Broadway was the most heavily trafficked road in the city, making it priority one.

    The work will involve opening the road itself and excavating the area around it, replacing the pipe, and adding more soil.

    The pedestrian walkway is something that city officials say has been asked for by city residents for years, especially after at least one tragic death of a 7th grader who was riding his bike. A walkway in the area was actually also in a master plan for the city going back to the 1970s.

    At least one lane will be open in each direction at all times.

    Residents and commuters can keep up with traffic impacts at LittletonCO.gov/ConeZone.

    Just west of the area of this work, the city is also working on revamping its downtown, closer to South Santa Fe Drive, to make that area more pedestrian- and bicyclist-friendly.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Voxtrend News
    • Website

    Related Posts

    CA Demands Action in Shooting

    January 13, 2026

    Diddy’s Jet Flies Off After Charges

    January 13, 2026

    WV AG Addresses Athlete Claims

    January 13, 2026

    Brinkley’s Blue Bliss: Vacation Snap!

    January 13, 2026
    Add A Comment

    Comments are closed.

    • Facebook
    • Twitter
    • Instagram
    • Pinterest
    Editors Picks
    Latest Posts

    Subscribe to Updates

    Get the latest sports news from SportsSite about soccer, football and tennis.

    Advertisement
    Demo
    Voxtrend News
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.